Skip to content

Glossary

Vessel Cut-Off meaning in ocean freight.

A vessel cut-off is the deadline for delivering a full export container to the terminal so it can be loaded on a specific sailing. It is also called the port, CY or cargo cut-off, and the carrier publishes it with the booking.

Reviewed November 5, 2026

Setting the deadline for each sailing

The cut-off belongs to one vessel, voyage and terminal. Carriers usually set it a day or more before the planned departure, which gives the terminal time to plan stowage and stage boxes for loading. Reefer and dangerous goods cargo can have deadlines of their own. When the vessel's arrival moves, the cut-off can move with it, so check the latest booking confirmation rather than the first one.

Other deadlines tied to the same sailing

The vessel cut-off covers the box itself, but a sailing usually carries several deadlines at once. The paperwork has its own, often earlier cut-offs, and a container that makes the gate but misses one of them can still be left behind. Many terminals also set an earliest receiving date, so arriving too early can be a problem as well. Most of these dates appear on the booking confirmation or the carrier's schedule.

  • Documentation cut-off for the shipping instructions
  • VGM cut-off for the verified gross mass
  • Dangerous goods cut-off, often earlier than the rest

Proving the box beat the cut-off

The full gate-in time is the record that matters. Compare it with the cut-off in the terminal's local time, not the office's time zone. If a truck is running late, some carriers accept a late gate request, but approval is never automatic and may carry a fee. If the box still misses the sailing, ask straight away which vessel it has been moved to.

Example

For a Friday departure from Rotterdam, the carrier sets the cut-off for Wednesday at noon, and a box that reaches the gate that afternoon may be rolled to next week's vessel.

Track a container

Save the reference now and create your account; tracking starts once your 30-day trial is active.

Next: create your account. A card is required to activate the 30-day trial.Opens Track in your workspace with the reference filled in.

Questions

What does Vessel Cut-Off mean?

A vessel cut-off is the deadline for delivering a full export container to the terminal so it can be loaded on a specific sailing. It is also called the port, CY or cargo cut-off, and the carrier publishes it with the booking.

What happens if I miss the vessel cut-off?

The container is usually rolled to the next sailing. Some carriers and terminals accept a late gate-in on request, but approval is not guaranteed and may cost extra.

Is the vessel cut-off the same as the ETD?

No. The ETD is when the ship is expected to leave. The cut-off comes earlier so the terminal has time to plan the stowage and load the container.

Start tracking containers with CargoScope.

Save the reference, add a card to activate the 30-day trial, and CargoScope builds the timeline from what the shipping line reports.